Submittal of PHA HAZOP Analysis of Cameron LNG, LLC under Docket NO. CP12-15.
01/26/2012JD Morris Manager, Permitting & Compliance 16945 Northchase Dr. Suite 1150 Houston, TX 77060 713-298-5479 jmorris@sempraglobal.com January 26, 2012 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Cameron LNG, LLC, Docket Nos. CP12-15-000 Dear Ms. Bose, On November 4, 2011 Cameron LNG, LLC (Cameron) filed an application to construct and operate a BOG liquefaction unit at its Cameron LNG Terminal near Hackberry, Louisiana. Cameron has recently completed a Process Hazard Analysis (PHA) for the proposed BOG Liquefaction project. The PHA was conducted using the HAZOP methodology. The PHA HAZOP study report is being submitted herein to supplement Camerons application and is included in Attachment 1. Please note the information provided in Attachment 1 contains Critical Energy Infrastructure Information ("CEII") as defined in the Commission's regulations, 18 C.F.R. 388. 113(c)(1). Accordingly, the information therein has been marked "Contains Critical Energy Infrastructure Information DO NOT RELEASE." Please contact me if you have any questions related to this request. Thank you for your attention to these matters. Respectfully submitted, /s/JD Morris JD Morris Manager, Permitting & Compliance Cameron LNG, LLC cc: Bill Rapp Bill Lansinger Cameron LNG FERC Submittal ATTACHMENT 1 HAZOP REPORT Porter McGuffie, Inc January 18, 2012 Note Attachment 1 contains Critical Energy Infrastructure Information (CEII) and has been removed. Contains Critical Energy Infrastructure Information (CEII) DO NOT RELEASE