Texas Eastern Transmission, LP submits the Uniontown to Gas City Project Section 7(c) FERC Application under CP14-104.
03/10/2014Uniontown to Gas City Project Texas Eastern Transmission, LP FINAL ENVIRONMENTAL REPORT Accompanying FERC Section 7(c) Application Exhibit F-1 FERC Docket No. CP14-___-000 Volume II-A Resource Reports PUBLIC March 2014 1.0 General Project Description FERC Docket No. CP14-___-000 March 2014 Resource Report 1 General Project Description FERC Environmental Checklist Part 380-Appendix A Minimum Filing Company Compliance or Requirements for Environmental Reports Inapplicability of Requirement Provide a detailed description and location map of the Project Section 1.2; Figure 1.2-1 facilities. (380.12(c)(1)) Describe any non-jurisdictional facilities that would be built in Section 1.9 association with the Project. (380.12(c) (2)) Provide current original U.S. Geological Survey (USGS) 7.5-minute Appendix A series topographic maps with mileposts showing the Project facilities. (380.12(c)(3)). Provide aerial images or photographs or alignment sheets based on Appendix C these sources with mileposts showing the Project facilities. (380.12(c)(3)). Provide plot/site plans of compressor stations showing the location Appendix B of the nearest noise-sensitive areas (NSA) within 1 mile. (380.12(c)(3,4)). Describe construction and restoration methods. (380.12(c)(6)). Section 1.4; Appendix E Identify the permits required for construction across surface waters. Section 1.6; Table 1.6-1 (380.12(c)(9)). Provide the names and addresses of all affected landowners and Appendix F certify that all affected landowners would be notified as required in 157.6(d). (380.12(a)(4) and (c)(10)). Additional Information Describe all authorizations required to complete the proposed action Section 1.6; Table 1.6-1 and the status of applications for such authorizations Provide plot/site plans of all other aboveground facilities that are not Appendix B completely within the right-of-way Provide detailed typical construction rights-of-way cross-section Appendix C diagrams showing information such as widths and relative locations of existing rights-of-way, new permanent rights-of-way, and temporary construction rights-of-way. See Resource Report 8 Land Use, Recreation, and Aesthetics Summarize the total acreage of land affected by construction and Table 1.3-1 operation of the project If Resource Report 5 Socioeconomics is not provided, provide the Appendix B start and end dates of construction, the number of pipeline spreads Final 1-ii FERC Section 7c Application March 2014 that would be used, and the workforce per spread. Send two (2) additional copies of topographic maps and aerial Provided images/photographs directly to the environmental staff of the Office of Energy Projects (OEP) Final 1-iii FERC Section 7c Application March 2014 Contents Section Page 1.0 Resource Report 1 - General Project Description ........................................................... 1-1 1.1 Purpose and Need ...........................................................................