Corrected Draft Resource Report 1, Vol. I for Fields Point Liquefaction Project of National Grid LNG, LLC under PF15-28.
11/02/2015FIELDS POINT LIQUEFACTION PROJECT DOCKET NO. PF15-28-000 ENVIRONMENTAL REPORT RESOURCE REPORT NO. 1 GENERAL PROJECT DESCRIPTION VOLUME I PUBLIC SUBMITTED BY: National Grid LNG, LLC 40 Sylvan Road Waltham, MA 02451 NOVEMBER 2015 Environmental Report NGLNG Fields Point Liquefaction Project Resource Report 1 General Project Description 1-i RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION SUMMARY OF COMMISSION FILING INFORMATION INFORMATION FOUND IN Provide a detailed description and location map of the Project facilities ( 380.12 (c)(1)). Sections 1.1.2 and 1.1.3; Appendix 1A Figures 1.1-1, 1.1-2, and 1.1-3 Describe any non-jurisdictional facilities that would be built in Section 1.8 association with the Project ( 380.12 (c)(2)). Provide current original U.S. Geological Survey (USGS) 7.5- minute series topographic maps with mileposts showing the Appendix 1A Figure 1.1-2 Project facilities ( 380.12 (c)(3)). Provide aerial images or photographs or alignment sheets based on these sources with mileposts showing the Project facilities ( Appendix 1A Figure 1.1-3 380.12 (c)(3)). Provide plot/site plans of compressor stations showing the location of the nearest noise-sensitive areas (NSA) within 1 Appendix 1A Figure 1.1-4 mile ( 380.12 (c)(3,4)). Describe construction and restoration methods for construction Section 1.3 ( 380.12 (c)(6)). Identify the permits required for construction across surface Section 1.6 and Table 1.6-1 waters ( 380.12 (c)(9)). Provide the names and addresses of all affected landowners and Section 1.7 and Appendix 1C certify that all affected landowners will be notified as required in (privileged and confidential 157.6(d) ( 380.12 (c)(10)). omitted from Public Version) November, 2015 Environmental Report NGLNG Fields Point Liquefaction Project Resource Report 1 General Project Description 1-ii TABLE OF CONTENTS 1.0 GENERAL PROJECT DESCRIPTION .........................................................................................1 1.1 Proposed Facilities .............................................................................................................3 1.1.1 Purpose and Need................................................................................................3 1.1.2 Location and Description of Existing Site and Facilities ....................................3 1.1.3 Location Maps, Detailed Maps, and Plot/Site Plans ...........................................6 1.2 Land Requirements ............................................................................................................7 1.3 Construction Procedures ....................................................................................................8 1.3.1 Timeframe for Construction................................................................................8 1.3.2 Construction Sequence........................................................................................9 1.3.3 Project Permitting Timeline .................................