Sound Energy Solutions' Application for authority to site, construct, & operate LNG Import Terminal Facilities pursuant to Section 3 of the Natural Gas Act & Part 153 of FERC's Regulations under CP04-58. Volume 1, Part 1 of 2.
01/25/2004Jnofflclal FERC-Generated PDF of 20040202-0036 Received by FERC OSEC 01/26/2004 in D o c k e t # : C P 0 4 - 5 8 - 0 0 0 ORIGINAL A PnOFESSIONALGOC~ORATION FILED lC60 Thom~ deflmaonS~rm~N.W. OFFICE OF THE Waaimgton, DC 20(~07-3877 SECRETARY ~.m) ~ab .',~:c r-ac~m~ %. nlWess JtN2b P 2:Oh ATTORNEYS AI LAW (~) a.gaz.z FEDERALENERGY REGULATORYCOMMISSION Johrt H. l~arne& Jr. PUBLIC (2~) g'm -lee6 The Honorable Magalie IL Salas Secretary Federal Energy Regulatory Commission 888 First Street N.E. Washington, D.C. 20426 Re: Sound Energy Solutions, Application for Authority To Site, Construct, And Ope~te LNG Import Terminal Facilities, Docket No. CP04 , ~ -000 Dear Ms. Salas: Enclosed for filing pursuant to Section 3 of the Natural Gas Act and Part 153 of the Commission's Regulations thereunder, is an "Application for Authority to Site, Construct, and Operate LNG Import Terminal Facilities" ("Application") by Sound Energy Solutions ("SES"). SES respectfully requests that the Commission issue a final order granting SES all necessary authorizations by October 20, 2004. The Application consists ofthe following 10 volumes and additional material: Transmittal letter, Application, Fom3 of Notice, and Exhibits A, B, and C required by Section 153.8(a)( 1), (2) and (3) of the Commission's regulations, ~ C.F.R. 153.8(a)(I), (2) and (3). (PUBLIC);. Volume I (Environmental Report - Resource Report Numbers 1,2, 3, 4, and 5 and Appendices) (PUBLIC); Jnofflclal FERC-Generated PDF of 20040202-0036 Received by FERC OSEC 01/26/2004 in D o c k e t # : C P 0 4 - 5 8 - 0 0 0 (EsSOUND NERGY OLUTIONS Long Beach LNG Import Project CONTENTS VOLUMESITHROUGHV Resource R e p o ~ s l ~ r o u g h 1 2 Figure 7 - Typical Directional Drill Construction Figure 8 - Cerrifos Channel Horizontal Directional Drill - Non-lntemet public Figure 9 - SoCal Edison Electric Interconnection - Sketch 1 Non-lnternet public Figure 10 - SoCal Edison Electric Interconnection - Sketch 2 Non-lntemet public Appendix 1-2 Correspondence Appendix 1-3 Adjacent LandownersJLessees - Non- intemet public RESOURCE REPORT 2 - WATER USE AND QUALITY 2 INTRODUCTION 2.1 GROUNDWATER RESOURCES 2.1.1 Existing Environment 2.1.1.1 Sole Source Aquifer Designations f 2.1.1.2 Principal Aquifers w 2.1.1.3 Water Supplies 2.1.1.4 Water Quality 2.1.2 Environmental Consequences 2.2 SURFACE WATER 2.2.1 Existing Environment 2.2.1.1 Waterbodies 2.2.1.2 Water Use Designations 2.2.1.3 Waterbody Sediments 2.2.1.4 Water Quality 2.2.2 Environmental Consequences 2.3 WETLANDS 2.4 REFERENCES Appendix 2-1 Draft Site-Specific Storm Water Pollution Prevention Plan (SWPPP) with Spill Prevention and Response Procedure (SPRP) Appendix 2-2 Horizontal Directional Drill Plan (HDD) January 2004 Page iii Jnofflclal FERC-Generated PDF of 20040202-0036 Received by FERC OSEC 01/26/2004 in D o c k e t # : C P 0 4 - 5 8 - 0 0 0 ~ SOUND ENERGY SOLUTIONS Long Beach IJVGImport Project CONTENTS VOLUMES I THROUGH V ...