Young Gas Storage Co., LTD. Notice Of Tariff Compliance Filing
11/14/2000DRAFT RESOURCE REPORT 1 JCEP LNG Terminal Project Docket No. PF12-7-000 RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION CONTENTS (Continued) 1.4 OPERATION AND MAINTENANCE PROCEDURES ...................................... 1-26 1.5 SAFETY CONTROLS....................................................................................... 1-27 1.5.1 Spill Containment ............................................................................... 1-27 1.5.2 Thermal Exclusion and Vapor Dispersion Zones ............................... 1-27 1.5.3 Hazard Detection System................................................................... 1-27 1.5.4 Hazard Control System ...................................................................... 1-28 1.5.5 Firewater System ............................................................................... 1-28 1.5.6 Fail Safe Shutdown System ............................................................... 1-29 1.5.7 Warning Systems ............................................................................... 1-29 1.5.8 Security System ................................................................................. 1-29 1.6 FUTURE PLANS AND ABANDONMENT......................................................... 1-30 1.7 PERMITS AND APPROVALS .......................................................................... 1-30 1.8 AGENCY AND PUBLIC COMMUNICATIONS ................................................. 1-30 1.8.1 Agency Contacts ................................................................................ 1-32 1.8.2 Affected Landowners.......................................................................... 1-33 1.9 NONJURISDICTIONAL FACILITIES DETERMINATION ................................. 1-34 1.9.1 Identified Nonjurisdictional Facilities .................................................. 1-34 1.9.2 Determination of the Need for FERC to Conduct an Environmental Review................................................................................................ 1-34 1.10 TOPOGRAPHIC MAPS AND AERIAL PHOTOGRAPHY ................................ 1-34 1.10.1 U.S. Geological Survey (USGS) Maps ............................................... 1-34 1.10.2 Aerial Photographs ............................................................................. 1-35 1.11 REFERENCES ................................................................................................. 1-35 July 2012 Page ii DRAFT RESOURCE REPORT 1 JCEP LNG Terminal Project Docket No. PF12-7-000 The Project will enhance maritime safety through improved navigational aids and increased tug capability (including waterborne firefighting capability). JCEP has prepared this application, and the accompanying Resource Reports 1 through 13, in compliance with the requirements of the FERC Regulations. Information supplied in these Resource Reports will be available to FERC in the preparation of an Environmental Impact Statement (EIS) under a third-party contractor agreement with JCEP as the Appl