Tennessee Gas Pipeline Company, L.L.C. submits tariff filing per 154.203: Rate Case 2011 - Settlement Implementation Clean Up Sheet No. 19 Corrected to be effective 2/1/2012 under RP11-1566 Filing Type : 580
02/23/2012GULF SOUTH PIPELINE COMPANY, LP PETAL GAS STORAGE, L.L.C. DOCKET NO. CP13-_____-000 EXHIBIT F1 ENVIRONMENTAL REPORT Gulf South Pipeline Company, LP Resource Report 1 General Project Description Southeast Market Expansion Project March 2013 SUMMARY OF FILING INFORMATION Data Found in To be INFORMATION Sources 1 Section Filed Minimum Requirements to Avoid Rejection 1. Provide a detailed description and location map of the project facilities. ( 380.12(c)(1)) 1.1.2 Include all pipeline and aboveground facilities. D Appendix 1A Include support areas for construction or operation. Identify facilities to be abandoned. 2. Describe any non-jurisdictional facilities that would be built in association with the project. ( 380.12(c)(2)) Include auxiliary facilities (See 2.55(a)). Describe the relationship to the jurisdictional facilities. Include ownership, land requirements, gas consumption, D 1.8 megawatt size, construction status, and an update of the latest status of federal, state, and local permits/approvals. Include the length and diameter of any interconnecting pipeline. Apply the four-factor test to each facility (see 380.12(c)(2)(ii)). 3. Provide current original U.S. Geological Survey (USGS) 7.5- minute-series topographic maps with mileposts showing the project facilities. ( 380.12(c)(3)) Maps of equivalent detail are acceptable if legible (check with 1.1.2 staff) D Appendix 1A Show locations of all linear project elements, and label them. Show locations of all significant aboveground facilities, and label them. 4. Provide aerial images or photographs or alignment sheets based on these sources with mileposts showing the project facilities. ( 380.12(c)(3)) 1.1.2 D No more than 1-year old Appendix 1A Scale no smaller than 1:6,000 5. Provide plot/site plans of compressor stations showing the location of the nearest noise-sensitive areas (NSA) within 1 mile. ( 380.12(c)(3,4)) Scale no smaller than 1:3,600 D Appendix 9C Show reference to topographic maps and aerial alignments provided above. 6. Describe construction and restoration methods. ( 380.12(c)(6)) Include this information by milepost Make sure this is provided for offshore construction as well. For the offshore this information is needed on a mile-by-mile basis D 1.3 and will require completion of geophysical and other surveys before filing. 7. Identify the permits required for construction across surface waters. ( 380.12(c)(9)) Include the status of all permits. For construction in the federal offshore area be sure to include D 1.6 consultation with the MMS. File with the MMS for rights-of-way grants at the same time or before you file with the FERC. 8. Provide the names and address of all affected landowners and certify that all affected landowners will be notified as required in 1.7 157.6(d). ( 380.12(c)(10)) D Appendix 1F Affected landowners are defined ...