Texas Eastern Transmission, LP submits the semiannual report for the reporting period May 1, 2012 through October 31, 2012 under CP08-15.
11/29/2012Dominion Cove Point LNG, LP 701 East Cary Street, Richmond, VA 23219 July 27, 2015 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Dominion Cove Point LNG, LP Cove Point Liquefaction Project CP13-113-000 Supplemental Information Volume 8 Foundations Series 1 STG, Fuel Flash, Water Treatment, Lean Gas Booster Compressor and Regeneration Gas Buildings and Foundations Dear Secretary Bose: By Order dated September 29, 2014, the Federal Energy Regulatory Commission (FERC or Commission) authorized Dominion Cove Point LNG, LP (DCP or Dominion) to construct and operate certain facilities that comprise the Cove Point Liquefaction Project (Project). Dominion Cove Point LNG, LP. 148 FERC 61,244 (the Order). On October 14, 2014, DCP submitted Volume Eight - Foundations Series 1 (Accession Numbers 20141014-5369 and 20141014-5370), and on December 8, 2014, FERC authorized the construction requested in Volume Eight (Accession Number 20141208-3004). DCP hereby submits supplemental information for Volume Eight regarding the drawings and calculations for the STG, Fuel Flash, Water Treatment, Lean Gas Booster Compressor and Regeneration Gas buildings and their foundations. DCP hereby requests written authorization from the Director of the Office of Energy Projects (OEP) to proceed with construction activities on the structural steel described in the attached supplemental information no later than September 25, 2015. This submission contains the following documents: Attachment 1: STG Building Steel Calculations (Contains Critical Energy Infrastructure Information Do Not Release, Contains Privileged Information Do Not Release, Not Available to Competitive Duty Personnel, and Proprietary, Protected Materials, Released Subject to Terms of Docket No. CP13-113 Protective Agreement). Attachment 2: STG Building Foundations Drawings (Contains Critical Energy Infrastructure Information Do Not Release, Contains Privileged Information Do Not Release, Not Available to Competitive Duty Personnel, and Proprietary, Protected Materials, Released Subject to Terms of Docket No. CP13-113 Protective Agreement). Attachment 3: STG Building Foundations Calculations (Contains Critical Energy Infrastructure Information Do Not Release, Contains Privileged Information Do Not Release, Not Available to Competitive Duty Personnel, and Proprietary, Protected Materials, Released Subject to Terms of Docket No. CP13- 113 Protective Agreement). Attachment 4: Fuel Flash Building Steel Calculations (Contains Critical Energy Infrastructure Information Do Not Release, Contains Privileged Information Do Not Release, Not Available to Competitive Duty Personnel, and Proprietary, Protected Materials, Released Subject to Terms of Docket No. CP13-113 Protective Agreement Attachment 5: Fuel Flash Building Foundations Drawings (Contains Critical Energy Infrastructure Information Do Not Release, Contains Privileged Information Do Not Release, Not Available to Competitive Dut