Phillips 66 Pipeline LLC submits tariff filing per 342.4(c): P66PL FERC No 7.2.0 Settlement Rates to be effective 12/10/2012 under IS13-53 Filing Type : 920
11/28/2012Appendix B Clean-Up Filing - 2015 Tariff Records Tennessee Gas Pipeline FERC Gas Tariff Sixth Revised Volume No. 1 Proposed Cancellation Date Effective September 1, 2015 Record Change Type CANCEL" Narrative Name of FERC Record ID Version Sheet Cancelled Cancelled Rate Schedules NET and NET-284 Third Revised Sheet No. 99A 627 9939.79.88 Second Revised Sheet No. 100 82 9529.66.84 Third Revised Sheet No. 101 83 9299.64.97 Second Revised Sheet No. 102 84 9393.88.83 Third Revised Sheet No. 102A 628 9606.73.58 Original Sheet No. 102B 1467 9135.83.72 Fourth Revised Sheet No. 103 85 9689.73.64 Third Revised Sheet No. 104 86 9048.58.73 Second Revised Sheet No. 105 87 9160.63.51 Second Revised Sheet No. 106 88 9884.78.97 Second Revised Sheet No. 107 89 9243.63.57 First Revised Sheet No. 537 329 9779.72.58 Second Revised Sheet No. 538 330 9139.57.67 Second Revised Sheet No. 539 331 9974.76.91 First Revised Sheet No. 540 332 9974.76.82 First Revised Sheet No. 541 333 9887.51.93 First Revised Sheet No. 542 334 9334.61.51 First Revised Sheet No. 543 335 9692.95.60 First Revised Sheet No. 566 338 9083.56.77 First Revised Sheet No. 567 339 9442.90.86 Second Revised Sheet No. 568 340 9278.61.60 Second Revised Sheet No. 569 341 9195.61.54 First Revised Sheet No. 570 342 9581.94.79 Third Revised Sheet No. 571 343 9995.80.78 Second Revised Sheet No. 572 344 9832.50.53 First Revised Sheet No. 573 345 9191.84.62 First Revised Sheet No. 574 346 9498.94.72 First Revised Sheet No. 575 347 9027.55.86 Second Revised Sheet No. 576 348 9386.89.95 First Revised Sheet No. 577 349 9052.84.65 Second Revised Sheet No. 578 350 9744.74.55 Tennessee Gas Pipeline Company, L.L.C. FERC NGA Gas Tariff Second Revised Sheet No. 100 Sixth Revised Volume No. 1 Superseding Substitute First Revised Sheet No. 100 NET RATE SCHEDULE (continued) 4. RECEIPT AND DELIVERY POINTS Shipper's receipt and delivery points are set forth in its Transportation Contract with associated maximum quantities and minimum pressures. All receipt points within the same rate zone and supply leg, if applicable, in which Shipper's Primary Receipt Points are located shall also be available as Secondary Receipt Points up to the maximum daily quantity that is applicable to the Primary Receipt Points in that rate zone and supply leg, if applicable. 5. GENERAL TERMS AND CONDITIONS 5.1 Definitions The definitions applicable to this NET Rate Schedule shall be the same as those set forth in the Contract. 5.2 Quality The natural gas to be delivered by Transporter hereunder shall have the same quality standards as set forth in the Contract. 5.3 Measurement and Measuring Equipment The provisions regarding Measurement and Measuring Equipment shall be the same as set forth in Article III of the General Terms and Conditions of Transporter's FERC Gas Tariff, Volume No. 1. 5.4 Uniform Quantities Shipper shall deliver and receive gas in uniform hourly quantities during any day with no significant fluctuations, provided, howeve