Calhoun LNG, LP and Point Comfort Pipeline Co submits an application to site, construct and operate a Liquefied Natural Gas Import Facilities to be located at the Port of Port Lavaca - Point Comfort etc under CP05-91.
03/17/2005Jnofflclal FERC-Generated P D F o f 20050325-0042 Received by FERC OSEC 03/18/2005 in D o c k e t # : CP05-91-000 PUBLIC ORIGINAL 1185 Avcnuc of the Americas I/kiNG 8(:S P A / L D I N G LLP New York, New York i0036-4003 www.kslaw.eom Lisa M. Toncry Direct Dial: 212-556-2307 Direct Fax: 212-556-2222 Itoncry@kslaw.com March 18, 2005 _ -', CO __iOl r .<-w The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street N.E. Washington, D.C. 20426 Re: Calhoun LNG, L . P . / ( d / I Docket No. CP05-/-000 Point Comfort Pipeline Company, L.P. Docket No. CPO5---O00 Dear Ms. Salas: Enclosed for filing pursuant to Section 3 of the Natural Gas Act ("NGA"), 15 U.S.C. 717Co)(a)(2004), and Parts 153 and 380 of the Commission's Regulations, 18 C.F.R. Parts 153 and 380 (2004), is an "Application for Authorization to Site, Construct and Operate Liquefied Natural Gas Import Facilities" ("Application") submitted by Calhoun LNG, L.P. ("CLNG") and Point Comfort Pipeline Company ("PCPLC") (together "the Applicants"). CLNG is seeking authorization to site, construct and operate a liquefied natural gas ("LNG") receiving terminal and associated facilities to be located at the Port of Port Lavaca - Point Comfort as a place of entry for the importation of LNG. PCPLC is also seeking authorization under NGA Section 3(a) to site, construct and operate an associated send-out pipeline to connect the CLNG import terminal to Texas intrastate pipelines and an industrial end- USer. This Application consists of the following material: Transmittal Letter; Application Volume (includes Form of Notice for the Federal Register and Exhibits A, B and C required by Section 153.8(a)(1), (2) and (3) of the Commission's Regulations, 18 C.F.R. 153.8(a)(1), (2) and (3) and Exhibit Z (Letters in Support of Project) ( P U S L I q ; .-;j:>i NEW PUBLIC YORK WASHINOTON) D.C. Jnofflclal FERC-Generated P D F o f 20050325-0042 Received by FERC OSEC 03/18/2005 in D o c k e t # : CP05-91-000 The Honorable Magalie R. Salas March 18, 2005 Page 2 Exhibit F: Exhibit F, Public Information Volume, Volume I (Environmental Report - Public versions of Resource Report Numbers 1-3 and 5-12 and Public Tables, Figures and Appendices).~UBlhlC); Exhibit F, Non-lntemet Public Volume, Volume 1I (Environmental Report - Non- Interact Public portions of Resource Reports) (NON-INTERNET PUBLIC); Exhibit F, Critical Energy Infrastructure Volume, Volume III (Environmental Report - Resource Report Number 12, Appendix 1 IC from ...