Cameron LNG, LLC submits draft Resource Report No. 11 under PF12-13.
10/17/2012JD Morris Manager, Permitting & Compliance 2500 Citywest Blvd., Suite 1800 Houston, TX 77042 713-298-5479 jmorris@sempraglobal.com October 17, 2012 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Cameron LNG, LLC Docket No. PF12-13-000 Submittal of Draft Resource Report 11 Dear Ms. Bose, On May 9, 2012, the Director of the Office of Energy Projects of the Federal Energy Regulatory Commission (Commission) authorized Cameron LNG, LLC (Cameron LNG) to commence the Commissions pre-filing review process with respect to Cameron LNGs proposed Liquefaction Project. Pursuant to Sections 157.21 (f) (10) and 380.12 (m) of the Commissions regulations, Cameron LNG hereby submits a draft of Resource Report 11. Please note that portions of this filing consist of Critical Energy Infrastructure Information (CEII). These portions have been labeled accordingly and are not to be released publicly. Please contact me if you have any questions related to this request. Thank you for your attention to these matters. Respectfully submitted, /s/JD Morris JD Morris Manager, Permitting & Compliance Cameron LNG, LLC cc: Bill Rapp Bill Lansinger Cameron LNG Liquefaction Project Docket No. PF12-13-000 Attachment 1 Draft Resource Report 11 Cameron LNG Liquefaction Project Cameron LNG CAMERON LNG LIQUEFACTION PROJECT Resource Report 11 Reliability and Public Safety See the Following To Verify Compliance with this Minimum FERC Filing Requirement: Resource Report Section: Describe measures proposed to protect the public from failure of the proposed facilities 11.4 & 11.8 (including coordination with local agencies). Discuss hazards, the environmental impact, and service interruptions which could reasonably 11.3, 11.7, & 11.10 ensue from failure of the proposed facilities. Discuss design and operational measures to avoid or reduce risk. 11.4 Discuss contingency plans for maintaining service or reducing downtime. 11.4.2 & 11.5 Describe measures used to exclude the public from hazardous areas. Discuss measures used to minimize problems arising from malfunctions and accidents (with estimates of 11.4.4, 11.4.6, & probability of occurrence) and identify standard procedures for protecting services and public 11.8 safety during maintenance and breakdowns. DRAFT RESOURCE REPORT 11 Cameron LNG Liquefaction Project Docket No. PF12-13-000 RESOURCE REPORT 11 RELIABILITY AND PUBLIC SAFETY CONTENTS 11. INTRODUCTION .............................................................................................. 11-1 11.1 OVERVIEW ...................................................................................................... 11-2 11.2 LNG SAFETY CODES AND REGULATIONS ........................................................... 11-2 11.3 HAZARD IDENTIFICATION .................................................................................. 11-3 11.3.1 Primary Hazards ..................................................................