Letter of Transmittal and Resource Report No. 1 for Golden Pass Products and Golden Pass Pipeline under PF13-14.
06/27/2013Public Version (Final) Golden Pass Export Pipeline Project Docket No. PF13-14-000 Resource Report No. 1 General Project Description Pre-Filing Preliminary Draft June 2013 Draft Resource Report No. 1 Docket No. PF13-14-000 Golden Pass Export Pipeline Project Resource Report No. 1 General Project Description Resource Report No. 1 Filing Requirements Information Resource Report Location 1. Detailed description and location map of the jurisdictional facilities. (18 C.F.R. Section 1.1.2 Section 380.12(c)(1)). Section 1.2 Include all pipeline and aboveground facilities. Figure 1.1-1 Include support areas for construction or operation. Identify facilities to be abandoned. 2. Description of non-jurisdictional facilities to be built in association with the Section 1.8 project. (18 C.F.R. Section 380.12(c)(2)). Include auxiliary facilities (see 18 C.F.R. Section 2.55(a)). Describe the relationship to the jurisdictional facilities. Include ownership, land requirements, gas consumption, megawatt size, construction status, and an update of the latest status of Federal, State, and local permits/approvals. Include the length and diameter of any interconnecting pipeline. Apply the four-factor test to each facility (see 18 C.F.R. 380.12(c)(2)(ii)). 3. Current original U.S. Geological Survey (USGS) 7.5-minute series topographic Appendix 1C maps with mileposts showing the project facilities. (18 C.F.R. Section Additional maps will be 380.12(c)(3)). provided in subsequent draft Show locations and label all linear project elements. of Resource Report No. 1 Show locations and label all significant aboveground facilities. 4. Aerial images or photographs or alignment sheets based on these sources with Appendix 1D mileposts showing the project facilities. (18 C.F.R. Section 380.12(c)(3)). Additional maps will be Must be no more than 1-year old. provided in subsequent draft of Resource Report No. 1 Must be of a scale no smaller than 1:6,000. 5. Plot/site plans of compressor stations showing the location of the nearest noise- Compressor station plot sensitive areas within 1 mile. (18 C.F.R. Section 380.12(c)(3,4)). plans will be provided in Must be of a scale no smaller than 1:3,600. subsequent draft of Resource Report No. 1. Show reference to topographic maps and aerial alignments. 6. Construction and rehabilitation methods. (18 C.F.R. Section 380.12(c)(6)). Section 1.3.2 Include information by milepost. Ensure information is provided for offshore construction as well. For offshore construction, information is needed on a mile-by-mile basis and will require completion of geophysical and other surveys before filing. 7. Permits required for construction across surface waters. (18 C.F.R. Section Section 1.6 380.12(c)(9)). Table 1.6-1 Include status of all permits. For construction in the Federal offshore area, include consultation with the MMS. Draft ...