Testimony of FERC Trial Staff under IS09-395, et. al..
07/14/2011Docket No. IS09-348-004, et al. Exhibit No. S-7 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION BP Pipeline (Alaska) Inc. ) Docket No. IS09-348-004, et al. EXHIBIT OF ULUNMA A. NWOKEAFOR Supporting Schedules WITNESS FOR THE STAFF OF THE FEDERAL ENERGY REGULATORY COMMISSION OFFICE OF ADMINISTRATIVE LITIGATION Washington, DC July 15, 2011 BP Pipeline (Alaska) Inc. Exhibit No. S-7 IS09-348-004, et al. Schedule No. 1 North Slope Oil and Gas Activity 2011 State of Alaska, Department of Natural Resources, Division of Oil and Gas, March 2011 Chukchi OCS: Department of Interior: BOEMRE to include a very large oil spill study to augment the supplementary environmental impact statement (SEIS) IS09-348-004, et al. for the 2008 Chukchi Sea outer continental shelf lease sale. Shell BP Pipeline (Alaska) Inc. Estimate final record of decision late October, 2011. Granted permits to conduct shallow marine hazard and ice-scouring Shell surveys and biological studies in the Chukchi and Beaufort Seas during Shell Chukchi Sea Burger prospect Summer of 2012 and 2013 open water seasons: Beaufort Sea - Sivulliq prospect. Plans to use the Noble Discoverer drillship to drill up to 4 wells per drilling season. Statoil Plans to use the Kulluk floating drilling platform to drill up to 2 wells per drilling season Fall 2010: Shot a 3-D Seismic Survey Over Chukchi Sea leases Preparing Plan of Exploration including site surveying & seabed coring during 2011 open water season. Pioneer Natural Resources UAF Development drilling continues at Oooguruk Unit. Plan to shoot a 2-D seismic survey over the Producing oil from Nuiqsut and Kuparuk PAs; Chukchi Borderland for geological tectonic research ENI applied for Torok PA. BP Nikaitchuq Unit Schrader Bluff PA approved Raven PA (within PBU) 1st oil January 30, 2011 shut-in due to legal dispute with Conoco Phillips land owner over BPs use of Beaufort Sea Focusing 2010-2011 drilling Nikaitchuq Heald Point surface lease. on CD 1 & CD 2 opportunities BP ASRC Beechey Liberty ultra-extended reach because of U.S. Corp of Engineers Northstar Applied to form Placer Unit Point drilling delayed for extensive CD-5 permit denial. Corps has remanded some issues Oooguruk engineering and design review Milne of purpose-built rig. for reconsideration. ! ( ODST-45A Dewline Point SAK RIVER 1A N SHORE 3 Exxon CHAR 1 N SHORE 1 DEWLINE 1 Drilled PT 15 & 16 in 2010. ( ! ( ! Bear Duck Plan pipeline to link Point Thomson PLACER 1 Kuparuk ! Liberty to Badami. EIS in progress. Record North Slope Borough Tooth Colville River Prudhoe Island of Decision expected March, 2012. CD 5 KUPCAKE 1 Planning to ...