Request of Dominion Transmission, Inc. under CP10-448.
12/15/2011Dominion Transmission, Inc. 701 East Cary Street, Richmond, VA 23219 December 16, 2011 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Dominion Transmission, Inc. Appalachian Gateway Project Docket No. CP10-448-000 Variance Request Dear Secretary Bose: By Order dated June 16, 2011, the Federal Energy Regulatory Commission (FERC) authorized Dominion Transmission, Inc. (Dominion) to construct and operate facilities which comprise the Appalachian Gateway Project. 135 FERC 61,239 (the Order) Dominion is hereby submitting a Variance Request for the FERCs approval for those activities outlined in the enclosed document. If you have any questions, please contact me at 804-771-4456. Respectfully submitted, Scott B. Francis Scott B. Francis Regulatory and Certificates Analyst II cc: Janine Cefalu, FERC Dominion Transmission, Inc. Variance Request No: TL-591-025 Appalachian Gateway Project VARIANCE REQUEST FORM Requested by: Michels Request Prepared by: M. Franz/Jesse B. Kulp Date Requested by Contractor: Date Submitted by CI to LEI: Date Submitted to FERC: 10/12/2011 10/11/2011 Urgency Level: High FERC Approval Reference No: I. LOCATION INFORMATION Spread: TL-591 Station No: 921+97 to 924+47 MP: 17.5 Alignment Sheet No: AD/ ES 18 Tract No: LL 132 Landowner: Umbel, Jeffrey & Kathleen New or Existing Landowner: Existing Other Agency Jurisdiction: Washington County SCD II. LAND COVER / LAND USE Current Land Use / Land Cover: Nearby Features: In or w/in 50 ft of a waterbody: Yes No T/E Species Habitat Water Well In or w/in 50 ft of a wetland: Yes No Cultural Resource Site Underground Utility Waterbody or wetland Name/ID: Residential Drainage culvert Net Acreage Affected: Net PFO: Other, specify: Net PEM: Net PSS: Provide distance for nearby features of checked boxes above, if applicable: III. VARIANCE INFORMATION Variance Level: Level 1 Level 2 Level 3 Variance From: Permit Plan/Procedure Specification Drawing Mitigation Other, specify: Attachments: No Yes, specify: red-lined alignment Photos: No Yes, list: drawing ES 18 Detailed Description of Variance: Dominion Transmission is requesting to change the crossing methodology from a convention bore to an HDD of I70. One part of this variance is a request for ATEWS between Stations 921+57 to 924+47. The requested ATEWS measures approximately 290 feet in length by 25 feet in width (.17 Ac.) and would be located adjacent to the Western edge of the existing LOD for TL-591. The proposed ATEWS falls within existing lawn and topsoil segregation will be performed as required. No additional tree clearing will be required for the requested ATEWS. In addition to the ATEWS, the proposed HDD route falls outside of the ...