Centerpoint Energy Gas Transmission Company, LLC submits its Prior Notice request to replace a portion of its Line A & abandon its Line AM-8 in its entirety, all located in Nevada & Hempstead Counties, AK under CP13-63.
01/30/201320130201-0202 FERC PDF (Unofficial) 01/31/2013 Gas Transmission Company, LLC P. 0. Box 21734 Shreveport, LA 71151-1734 (318) 429-3708 January 31, 2013 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N. E. Washington, D.C. 20426 Re: CenterPoint Energy Gas Transmission Company, LLC Docket No. CP13-~-000 Dear Ms. Bose: CenterPoint Energy Gas Transmission Company, LLC ("CEGT"), pursuant to section 157.205 of the Natural Gas Act ("NGA"), 18 CFR tj157.205, hereby submits an original and seven (7) copies of its Prior Notice request under Section 157.208(b), 18 CFR tj157.208(b), Section 157.211(a)(2), 18 CFR [[157.211(a)(2),and 157.216(b), 18 CFR tj157.216(b), to replace a portion of its Line A and abandon its Line AM-8 in its entirety, all located in Nevada and Hempstead Counties, Arkansas. The items being filed herein are organized pursuant to 18 C.F.R. tj388 as described below: Volume I: Public [Original (with CD) and seven paper copies] Letter of Transmittal Application Text Exhibit F System Map and Vicinity Maps showing the Location of the Project Exhibit K Cost of Facilities Exhibit Y Proposed Accounting Entry Exhibit Z Federal Register Notice Volumes TA ds I-B: Public [Original (with CD) and seven paper copies] Letter of Transmittal Exhibit F-1 Environmental Resource Reports Volume II: CEII [Original (with CD) and two paper copies] Letter of Transmittal Exhibit G & G-11 Flow Diagrams Appendix 1A Project Maps and Drawings Volume III: Privileged and Confidential [Original (with CD) only] Letter of Transmittal Attachment 1A Alignment Sheets and HDD Plans Attachment 1E - Landowner List Attachment 4A Phase 1 Report 20130201-0202 FERC PDF (Unofficial) 01/31/2013 Ms. Kimberly D. Bose January 31, 2013 Page 2 of 2 CEGT respectfully requests: (I) that the information herein submitted in Volume II be treated as CEII, as Volume II contains information about proposed critical infrastructure that could be useful to any persons planning an attack on that infrastructure pursuant to 18 C. F. R. $ 388.112; and; (2) that the information herein submitted in Volume III be accorded privileged and confidential treatment. Any questions concerning the enclosed filing should be addressed to the undersigned. Respectfully submitted, CenterPoint Energy Gas Transmission Company, LLC B. Michelle Willis Manager, Regulatory & Compliance 20130201-0202 FERC PDF (Unofficial) 01/31/2013 CP13- -000 CENTERPOINT ENERGY GAS TRANSMISSION COMPANY, LLC EXHIBIT F-I ENVIRONMENTAL RESOURCE REPORTS 20130201-0202 FERC PDF (Unofficial) 01/31/2013 e Qentefiremt. Eneftly TABLE OF CONTENTS 1.0 RESOURCE REPORT I - GENERAL PROJECT DESCRIPTION...... 1.1 INTRODUCTION. ......I - I 1.2 PROJECT DESCRIPTION .. .1-2 1.2.1 Purpose and Need .. ......I -4 1.2.2 Project Maps and Drawings. ......I -4 1.3 LAND REQUIREMENTS . .1-4 1.3.1 New Project Facilities .. 1...