LNG Development Company, LLC (d/b/a Oregon LNG) and Oregon Pipeline Company submit Stakeholder mailing list along with draft Resource Reports 1 and 10 under PF12-18-000.
08/12/2012Oregon LNG Export Project Prefiling Review Draft Resource Report 1 General Project Description Docket Number PF12-18-000 Prepared for LNG Development Company, LLC (d/b/a Oregon LNG) and Oregon Pipeline Company, LLC Prepared by CH2M HILL Engineers, Inc., and CH-IV International August 2012 PDX/083010008 | ES032312232445PDX Resource Report 1General Project Description Summary of Filing Information Minimum Requirements Location Addressed 1. Provide a detailed description and location map of the project Sections 1.1, 1.3, 1.4, and facilities. (380.12(c)(1)) 1.5; Figures 1.1-1, 1.1-2, 1.1-3, 1.3-1, 1.3-2, 1.3-4A Include all pipeline and aboveground facilities. K, , 1.3-5, 1.3-6, and 1.3-7; Include support areas for construction or operation. Appendices 1A through 1F Identify facilities to be abandoned. 2. Describe any nonjurisdictional facilities that will be built in Section 1.11 and Figure association with the project. (380.12(c)(2)) 1.11-1 Include auxiliary facilities (see 2.55(a)). Describe the relationship to the jurisdictional facilities. Include ownership, land requirements, gas consumption, megawatt size, construction status, and an update of the latest status of Federal, State, and local permits/approvals. Include the length and diameter of any interconnecting pipeline. Apply the four-factor test to each facility (see 380.12 (c)(2)(ii)). 3. Provide current original U.S. Geological Survey 7.5-minute series Appendix 1D topographic maps with mileposts showing the project facilities. (380.12(c)(3)) Maps of equivalent detail are acceptable if legible (check with staff). Show locations of all linear project elements, and label them. Show locations of all significant aboveground facilities, and label them. 4. Provide aerial images or photographs or alignment sheets based on Appendix 1C these sources with mileposts showing the project facilities. (380.12(c)(3)) No more than 1-year old. Scale no smaller than 1:6,000. PDX/083010008 | ES032312232445PDX Oregon LNG 1-i FERC NGA Sections 3a and 7c Application OREGON LNG EXPORT PROJECT RESOURCE REPORT 1GENERAL PROJECT DESCRIPTION Minimum Requirements Location Addressed 5. Provide plot/site plans of compressor stations showing the location Figure 1.1-3; Appendices 1C of the nearest noise-sensitive areas within 1 mile. (380.12(c)(3,4)) and 1D Scale no smaller than 1:3,600. Show reference to topographic maps and aerial alignments provided above. 6. Describe construction and restoration methods. (380.12(c)(6)) Section 1.5 Include this information by milepost. Make sure this is provided for offshore construction as well. For the offshore this information is needed on a mile-by-mile basis and will require completion of geophysical and other surveys before filing. 7. Identify the permits required for construction across surface waters. Section 1.8; Table 1.8-1 (380.12(c)(9)) Include the status of all permits. For construction in the Federal offshore area be sure to ...