Liberty Gas Storage LLC's CD containing Volume II, Resources Reports 1-12 to its abbreviated appl to construct, etc, CP05-92 et al. E:\Liberty Volume II - Resource Reports\Liberty RR1 Text
03/24/2005LIBERTY GAS STORAGE LLC LIBERTY GAS STORAGE PROJECT ------------------------------------------------------------------------------- |Resource Report 1 - General Project Description | ------------------------------------------------------------------------------- |To Verify Compliance with this Minimum FERC Filing Requirement: |See the | | |Following | | |Resource | | |Report | | |Section: | ------------------------------------------------------------------------------- |Describe and provide location maps of all jurisdictional |Section | |facilities, including all aboveground facilities associated with |1.1 | |the project (such as: meter stations, pig launchers/receivers, |Section | |valves), to be constructed, modified, abandoned, replaced, or |1.1.2 | |removed, including related construction and operational support |Figure 1-1| |activities and areas such as maintenance bases, staging areas, |Figures 1-| |communications towers, power lines, and new access roads (roads to|2, 1-3, 1-| |be built or modified). As relevant, the report must describe the |4, | |length and diameter of the pipeline, the types of aboveground |1-5, and | |facilities that would be installed, and associated land |1-6 | |requirements. It must also identify other companies that must |Section | |construct jurisdictional facilities related to the project, where |1.2 | |the facilities would be located, and where they are in the |Section | |Commissions approval process. (* 380.12(c)(1)) |1.7 | ------------------------------------------------------------------------------- |Identify and describe all nonjurisdictional facilities, including |Section | |auxiliary facilities, that will be built in association with the |1.7 | |project, including facilities to be built by other companies. | | |(i) Provide the following information: |Resource | |(A) A brief description of each facility, including as |Report 2 | |appropriate: ownership, land requirements, gas consumption, | | |megawatt size, construction status, and an update of the latest |Resource | |status of federal, state, and local permits/approvals; (B) The |Report 3 | |length and diameter of any interconnecting pipeline; (C) Current | | |1:24,000/1:25,000 scale topographic maps showing the location of |Resource | |the facilities; (D) Correspondence with the appropriate State |Report 4 | |Historic Preservation Officer (SHPO) or duly authorized Tribal | | |Historic Preservation Officer (THPO) for tribal lands regarding |Resource | |whether properties eligible for listing on the National Register |Report 8 | |of Historic Places (NRHP) would be affected; (E) Correspondence | | |with the U.S. Fish and Wildlife Service (and National Marine | | |Fisheries Service, if appropriate) regarding potential impacts of | | |the proposed facility on federally listed threatened and | | |endangered species; and (F) For facilities within a designated | | |coastal zone management area, a consistency determination or | | |evidence that the owner has requested a consistency determination | | |from the states coastal zone