REQUEST FOR AUTHORIZATION PURSUANT TO BLANKET CERTIFICATE PRIOR NOTICE PROCEDURES (Peabody Bear Run Project) of Texas Gas Transmission, LLC under CP12-481.
07/01/20123800 Frederica Street P.O. Box 20008 Owensboro, KY 42304-0008 270/926-8686 July 2, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Texas Gas Transmission, LLC (Texas Gas) Prior Notice Request for Authorization Docket No. CP12-___-000 Dear Secretary Bose: Pursuant to the prior notice procedures prescribed by Sections 157.205 and 157.208 of the Federal Energy Regulatory Commissions (Commission) regulations and the blanket certificate authority granted in Docket No. CP82-407-000, Texas Gas hereby submits for filing with the Commission a Prior Notice Request for Authorization to complete a miscellaneous rearrangement of facilities by abandoning in place approximately 9.3 miles of 12-inch diameter pipeline on the Slaughters-Montezuma system, and by replacing and relocating the pipeline with approximately 11.9 miles of 12-inch diameter pipeline, all in Sullivan County, Indiana. In accordance with the Commissions Filing Guide and Qualified Documents List, as amended January 3, 2012, this Prior Notice Request is being eFiled, and two complete paper copies are being provided to the Office of Energy Projects. This filing is comprised of three volumes: Volume I, Public; Volume II, Critical Energy Infrastructure Information; and Volume III, Privileged Information. A table of contents is attached hereto. Any questions regarding this Prior Notice Request should be directed to me. Respectfully submitted, /s/ Kathy D. Fort TEXAS GAS TRANSMISSION, LLC Table of Contents Volume I Public Attachment 1 Map of Proposed Facilites Attachment 2 Environmental Report: Resource Reports Appendix 1 Agency Consultation Appendix 2 Project Construction Plans Stormwater Pollution Prevention Plan Spill Prevention, Control, and Countermeasure Plan Plan for the Unanticipated Discovery of Historic Properties or Human Remains During Construction Plan for the Unanticipated Discovery of Contaminated Environmental Media Plan for Containment of Inadvertent Release of Drilling Mud During Horizontal Directional Drilled Wetland and Waterbody Crossings Appendix 3 Mapping and Drawing Supplement Project Location Map Project Topographic Excerpt Maps Project National Wetland Inventory Maps Project Aerial and Environmental Resources Maps Project Soils Maps Construction Typical Package Appendix 4 Wetland Delineation Report Volume II Critical Energy Intrastructure Information Attachment 3 System Flow Diagram Volume III Privileged Information Attachment 4 Reimbursement Agreement Appendices to Attachment 2 Environmental Report: Appendix 5 Alignment Sheets Appendix 6 List of Affected Landowners Appendix 7 Cultural Resource Survey Report