Corpus Christi Liquefacation, LLC and Cheniere Corpus Christi Pipeline, L.P., submit Draft Appendices to Draft Resource Report 13 for the Stage 3 Project, under PF15-26.
11/01/2015Corpus Christi Liquefaction, LLC and Cheniere Corpus Christi Pipeline, L.P. Corpus Christi Liquefaction Project Stage 3 Resource Report 13 Engineering Data Appendix U.13-7 Floodplain Maps Document Number Title FEMA Rate Map FIRM Flood Insurance Rate Map - San Patricio County, Texas, March 18, 1985. Surge Report Desktop Investigation of Storm Surge CCLNG 2006-07-06 Rev.1 September, 2015 DESKTOP INVESTIGATION OF STORM SURGE CORPUS CHRISTI LNG, L.P. PORTLAND, TX Prepared for Prepared by This document is released for the purpose of review; it is not intended to be used for bidding or construction purposes. 200.30175.19/42045 July 6, 2006 (Rev. 1) Corpus Christi LNG Desktop Investigation of Storm Surge LIST OF FIGURES Page Figure 2.1 Site vicinity map......................................................................................................... 2 Figure 2.2 Aerial Photograph of the proposed CCLNG site (undated). ...................................... 3 Figure 2.3 Topographic map showing the proposed CCLNG site............................................... 4 Figure 3.1 Historic storm tracks for hurricanes passing within 65 nm of Ingleside, TX............. 6 Figure 3.2 Estimated return periods for Category 3 hurricanes (NHC 2006A)........................... 7 Figure 3.3 Significant hurricanes to affect CCLNG vicinity (NOAA 2006A)............................ 8 Figure 3.4 Storm surge and high water marks (feet) on Texas coast during Hurricane Carla (Dunn 1962)................................................................................................................ 9 Figure 3.5 Infrared image Hurricane Allen, 1980 (NOAA 2006B)........................................... 10 Figure 4.1 FEMA Flood Insurance Rate Map for the proposed CCLNG site (FEMA 1985). .. 13 Figure 4.2 Corpus Christi Basin SLOSH modeling domain...................................................... 14 Figure 4.3 SLOSH MOMs for Category 5 Hurricanes. ............................................................. 15 Figure 4.4 Representative SLOSH MEOWs at the proposed CCLNG site............................... 16 Figure 4.5 Representative SLOSH MEOWs based on heading and strength of hurricane........ 16 Figure 5.1 Illustration of total water level elevation with combined surge and waves. ............ 19 LIST OF TABLES Page Table 2.1 Critical infrastructure components............................................................................... 3 Table 3.1 Saffir-Simpson Hurricane Scale .................................................................................. 5 Table 3.2 Catalog of historical hurricanes near CCLNG (NOAA 2006A).................................. 6 Table 3.3 Hurricane return periods for Corpus Christi, TX......................................................... 7 Table 5.1 Wind-Wave characteristics during hurricanes at CCLNG. ....................................... 19 Table 5.2 Total water level elevations summary. ...............................................................