Freeport LNG Developement, LP's CD containing Environmental Report, Resource Reports 1 through 12 etc re Freeport LNG Terminal Project under CP03-75. Part 1 of 2.
03/27/2003List of Figures Figure Title..............................................................................................................................Page Resource Report 1 General Project Description 1.1.1 U.S. Natural Gas.............................................................................................................1-4 1.1.2 Historic and Forecasted Natural Gas Reserves and Production for the Period 1945-2020 for the Lower 48 State of the United States..................................................1-5 1.1.3 Historic and Forecasted U.S. Natural Gas Supply Demand..........................................1-6 1.1.4 1999 Comparison of Production and Consumption in Selected States............................1-7 1.1.5 Historic and Forecasted Annual Demand for Natural Gas is Texas, 1980-2020..............1-8 1.1.6 Historic and Forecasted Natural Gas Production and Consumption for Texas, 1967-2010.......................................................................................................................1-9 1.1.7 Comparison of Texas Natural Gas Consumption Versus Other Major Industrial and Domestic User Groups for the Year 2000.....................................................................1-10 1.1.8 1987 to 1997 Load Growth Comparison Versus Other Selected States.........................1-11 1.1.9 Average Number of Active Natural Gas Wells and Total Production for Texas, 1960-2000.....................................................................................................................1-12 1.1.10 Project Area, Proposed Freeport LNG Facility, Brazoria County, Texas (REDACTED TO VOLUME II) 1.1.11 Aerial Imagery, Proposed Freeport LNG Facility, Brazoria County, Texas (REDACTED TO VOLUME II) Resource Report 2 Water Use and Quality 2.1.1 Location of the Gulf Coast Aquifer in Texas...................................................................2-2 Resource Report 10 - Alternatives (REDACTED TO VOLUME II) 10.3.1 Alternate Site and Pipeline Route Approximate Project Limits 10.3.2 Proposed 36 Natural Gas Pipeline Alternate Routes Quad A 10.3.3 Proposed 36 Natural Gas Pipeline Alternate Routes Quad B Appenidix A.2 Alignment Sheets (REDACTED TO VOLUME II) 3030-9101 36-inch Natural Gas Pipeline Route and Alignment Sheet 1 3030-9102 36-inch Natural Gas Pipeline Route and Alignment Sheet 2 3030-9103 36-inch Natural Gas Pipeline Route and Alignment Sheet 3 3030-9104 36-inch Natural Gas Pipeline Route and Alignment Sheet 4 3030-9105 36-inch Natural Gas Pipeline Route and Alignment Sheet 5 3030-9106 36-inch Natural Gas Pipeline Route and Alignment Sheet 6 3030-9107 36-inch Natural Gas Pipeline Route and Alignment Sheet 7 3030-9108 36-inch Natural Gas Pipeline Route and Alignment Sheet 8 Appendix A.3 USGS 7.5-minute Topographic Maps (REDACTED TO VOLUME II) USGS 7.5-minute Topographic Map, Freeport, Texas USGS 7.5-minute Topographic Maps, Oyster Creek, Texas Appendix A.4 Design Plans 10031-03-C4 Civil Details of Storage & Vaporization Unit 3030-0501 Stratton Ridge Site Plan (REDACT