(doc-less) Motion to Intervene of El Paso Municipal Customer Group under RP16-234.
12/06/2015September 2012 128156 AIR QUALITY PLAN APPROVAL APPLICATION TEAM 2014 TURBINE INSTALLATION OPERATING PERMIT NO. 65-00839 DELMONT COMPRESSOR STATION GREENSBURG, PENNSYLVANIA PREPARED FOR: TEXAS EASTERN TRANSMISSION, L.P. HOUSTON, TEXAS SUBMITTED TO: PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION SOUTHWEST REGIONAL OFFICE PITTSBURGH, PENNSYLVANIA Prepared by Michael Baker Jr., Inc. Moon Township, Pennsylvania AIR QUALITY PLAN APPROVAL APPLICATION Texas Eastern Transmission Sept 2012 Delmont Compressor Station Greensburg, Pennsylvania AIR QUALITY PLAN APPROVAL APPLICATION TEAM 2014 Turbine Installation Delmont Compressor Station Greensburg, Pennsylvania 65-00839 Submitted to: Pennsylvania Department of Environmental Protection Southwest Regional Office Pittsburgh, Pennsylvania Prepared for: Texas Eastern Transmission, L.P. Houston, Texas Prepared by: Michael Baker Jr., Inc. Moon Township, Pennsylvania Michael Baker Jr., Inc. A Unit of Michael Baker Corporation Airside Business Park 100 Airside Drive Moon Township, PA 15108 OFFICE: 412-269-6300 FAX: 412-375-3995 September 17, 2012 Mr. Mark Gorog, PE Permit Chief, Air Quality Program Pennsylvania Department of Environmental Protection Southwest Regional Office 400 Waterfront Drive Pittsburgh, PA 15222 RE: Plan Approval Application Delmont Compressor Station; 65-00839 TEAM 2014: Turbine Installation Dear Mr. Gorog: On behalf of Texas Eastern Transmission, L.P. (Texas Eastern) Michael Baker Jr., Inc. (Baker) is submitting to the Pennsylvania Department of Environmental Protection (PADEP) the attached Plan Approval Application for the Delmont Compressor Station for the proposed installation of one (1) Solar Titan 250 turbine with a construction start date of March 1, 2014. In conjunction with this project, the facility will be permanently retiring six (6) reciprocating internal combustion engines and one (1) gas fired turbine, which will result in an overall net decrease in emissions from nitrogen oxides and carbon monoxide. The facility is located at 160 Adele Lane, Salem Township, Greensburg, PA 15601 and currently operates in compliance with Title V Operating Permit 65-00839. Enclosed in this application package you will find the following: 1. The plan approval application forms, with original signatures. a. Permit Application General Information Form; b. Application for Plan Approval to Construct, Modify or Reactivate an Air Contaminant Source and/or Air Cleaning Device Combustion Form (submitted in triplicate); and c. Air Pollution Control Act Compliance Review Form, along with documentation of legal name. 2. One copy of supporting documentation for the plan approval application. 3. A check in the amount of $1,700 (NSPS) made payable to the Commonwealth of PA Clean Air Fund to cover the plan approval fee. The enclosed materials constitute all of the necessary forms and additional information required of a complete application in accordance with 127.12. If