Questar Pipeline Company's Draft Resource Report Nos. 1-11 for its JL 47 Loop Project under PF12-14-000.
08/13/2012Questar Pipeline Company 333 South State Street P. O. Box 45360 Salt Lake City, UT 84145-0360 Tel 801 324 5555 August 14, 2012 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission Room 1A 888 First Street, N.E. Washington, D.C. 20426 Dear Ms. Bose: Re: Questar Pipeline Company Docket No. PF12-14-000 JL 47 Loop Project Draft Resource Report Nos. 1 through 11 Pursuant to 18 C.F.R. 157.21(f)(10) of the Commission's Pre-filing Procedures, Questar Pipeline Company (Questar) submits for filing, in the referenced docket, draft Resource Report Nos. 1 through 11. This filing is submitted pursuant to the Commission's Order No. 703 "filing Via the Internet" guidelines issued November 15, 2007, in Docket no. RM07-16-000. Please direct any questions regarding this filing me at the numbers provided below. Thank you for your assistance. Respectfully submitted, /s/ Greg Williams Greg Williams Senior Regulatory Affairs Analyst Questar Pipeline Company (801) 324-5370 (801) 324-5834 (fax) greg.williams@questar.com Enc. cc: Laurence Sauter, Jr. - Room No. 62-51 (3) Questar JL 47 Loop Pipeline Project Resource Report 1 General Project Description Docket Nos. PF12-14-000 and CP12-__-000 TABLE OF CONTENTS 1.0 RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION ..............................1-1 1.1 GENERAL PROJECT DESCRIPTION ..............................................................1-2 1.2 PROPOSED FACILITIES, LOCATIONS, AND LAND REQUIREMENTS ..........1-2 1.2.1 New Pipeline and Associated Facilities .................................................1-3 1.2.1.1 Construction Right-of-Way .........................................................1-4 1.2.1.2 Temporary Extra Workspaces and Contractor Yards .................1-7 1.2.1.3 Pipeline Offsets..........................................................................1-9 1.2.1.4 Topsoil Stripping ......................................................................1-11 1.2.1.5 Permanent Right-of-Way .........................................................1-12 1.2.2 Access Roads .....................................................................................1-13 1.3 MAPS AND PHOTOGRAPHS.........................................................................1-13 1.4 NON-JURISDICTIONAL FACILITIES..............................................................1-13 1.5 NOISE SENSITIVE AREAS ............................................................................1-13 1.6 CONSTRUCTION AND RESTORATION PROCEDURES ..............................1-14 1.6.1 Questars Plan and Procedures ...........................................................1-14 1.6.2 Standard Pipeline Construction Procedures ........................................1-14 1.6.2.1 Marking of Right-of-Way ..........................................................1-14 1.6.2.2 Clearing and Grading ...............................................................1-14 1.6.2.3 Trenching............................................................................