Kim Robinson’s Comment Opposing the PennEast Pipeline — FERC Docket PF15-1

On June 7, 2015, Kim Robinson submitted a letter to the Federal Energy Regulatory Commission (FERC) opposing the proposed PennEast Pipeline project, referenced in FERC Docket PF15-1. The comment argues that the proposed interstate natural gas pipeline was unnecessary given existing infrastructure, projected energy-market developments, and the anticipated growth of renewable energy.

Existing Pipeline Capacity and Natural Gas Demand

A central argument in the letter is that the United States could accommodate additional natural gas demand through more efficient use of existing pipeline infrastructure, rather than constructing new interstate pipelines. The author references a February 2015 U.S. Department of Energy report, which discussed how geographically distributed growth in natural gas production and electricity demand could reduce the need for additional pipeline capacity.

The comment also points to opportunities to increase utilization of existing pipelines, redirect natural gas flows, and expand capacity on established systems. In the author's view, these alternatives could meet future transportation needs while avoiding some of the costs and impacts associated with new infrastructure.

Energy Transition and Future Natural Gas Demand

The letter considers the anticipated role of natural gas in the transition away from coal-fired electricity generation. Drawing on contemporary analysis from the U.S. Energy Information Administration, the Environmental Protection Agency, and other publications, Robinson argues that natural gas could serve as a transitional fuel while renewable energy and energy-efficiency technologies expanded.

The comment suggests that this anticipated transition should be considered when evaluating the long-term need for new pipeline infrastructure. It raises concerns about the possibility of investing in facilities that could become less necessary as the electricity generation mix changes.

Environmental and Community Concerns

The submission also highlights potential environmental and community impacts associated with the proposed pipeline. These include concerns about land disturbance, historically significant areas, water supplies, and risks to nearby families and schoolchildren.

Robinson argues that these potential impacts should be weighed against the claimed benefits of the project, particularly if existing infrastructure could provide sufficient transportation capacity. The letter emphasizes evaluating the proposed development against a “No Build” alternative, under which the pipeline would not be constructed.

References to Federal Energy Market Analysis

To support the argument, the letter cites several reports and publications available at the time, including:

  • The U.S. Department of Energy’s February 2015 report, Natural Gas Infrastructure Implications of Increased Demand from the Electric Power Sector.
  • The Federal Energy Regulatory Commission’s 2014 State of the Markets Report, published in March 2015.
  • The U.S. Energy Information Administration’s May 2015 analysis of the potential impacts of the Clean Power Plan.
  • FERC Order No. 809, issued April 16, 2015, concerning coordination of scheduling processes for interstate natural gas pipelines and public utilities.
  • Contemporary commentary on renewable energy, natural gas infrastructure, and the transition to a lower-carbon electricity system.

These references provide the historical context for the submission's claims about pipeline capacity, regional gas markets, infrastructure investment, and changing energy demand.

Historical Significance

This document provides an example of public participation in the federal review of proposed natural gas infrastructure. It illustrates how concerns about pipeline capacity, energy policy, environmental impacts, and long-term market conditions were presented to FERC during the PennEast Pipeline proceeding in 2015.

The arguments summarized here reflect the position expressed by the author in the original submission; they should not be interpreted as independent findings or as a statement of the project's current regulatory status.

For complete details, download the full document: Download

Pages: 6

Back to blog