Document date: November 12, 2002
Organization: GE Power Systems Energy Consulting
Regulatory agency: Federal Energy Regulatory Commission (FERC)
Docket number: RM02-4-000
Subject: Proposed procedures for handling Critical Energy Infrastructure Information (CEII)
Overview
On November 12, 2002, GE Power Systems Energy Consulting (PSEC) submitted comments to the Federal Energy Regulatory Commission (FERC) in response to a Notice of Proposed Rulemaking issued on September 5, 2002. The filing addresses how sensitive technical information about the electric power grid should be handled, particularly information that could affect national security if misused.
The comments reflect PSEC’s experience providing technical consulting services to the electricity industry, including analysis of electric generation and transmission systems. The organization argues that protecting critical infrastructure information is important, but that access restrictions must also account for the practical needs of companies and professionals responsible for planning, operating, analyzing, and maintaining the power system.
The central issue is how to protect sensitive information without unnecessarily restricting legitimate technical work or the functioning of competitive electricity markets.
National Security and Electric Grid Information
The filing discusses concerns about the potential misuse of detailed technical information relating to the electric grid. PSEC explains that the complexity of the power system makes specialized engineering knowledge important when interpreting technical datasets and evaluating system performance.
Based on this assessment, the organization supports limiting access to information that could be misused to threaten critical infrastructure. However, it cautions against treating all information associated with the electricity industry as equally sensitive.
The comments distinguish between technically sensitive infrastructure data and commercially sensitive information, such as bid prices and other strategic market information. PSEC argues that these categories raise different issues and should be considered separately when developing regulatory procedures.
The submission therefore advocates a targeted approach to information protection rather than a single set of restrictions applied indiscriminately to all energy-related data.
Balancing Security with Legitimate Access
A central theme of the filing is the need to balance infrastructure security with the information requirements of the electricity industry. PSEC summarizes this challenge by stating that “the key here is balance.”
The organization recommends establishing procedures that allow qualified users to obtain information when they have a legitimate professional need. It proposes two complementary approaches:
- Prequalification for regular users: Organizations with continuing, legitimate needs for technical grid information should be able to establish eligibility for ongoing access.
- Case-by-case access for occasional users: Applicants who require information less frequently should have a process for obtaining access without unnecessary delays.
The comments identify transmission owners and operators, transmission planners, generation operators, technical consultants, academic researchers, and equipment manufacturers as examples of potential legitimate users.
PSEC argues that these groups need access to technical information to perform their responsibilities effectively. A regulatory process should therefore consider both the risks associated with disclosure and the consequences of restricting information needed for reliable planning and operation.
Proposed Access and Oversight Procedures
The filing outlines several recommendations for implementing controlled access to sensitive infrastructure information.
1. Establish a prequalification process
PSEC recommends allowing organizations with ongoing information needs to qualify for access in advance, rather than requiring them to justify every individual request separately.
The proposed approach would include a designated security coordination contact responsible for working with the relevant FERC coordinator and supporting compliance with access requirements.
2. Minimize delays for occasional requests
For users who do not need regular access, PSEC recommends a process that allows legitimate requests to be handled promptly. The filing suggests that a delay of ten business days should be the maximum tolerable period in this context.
This recommendation reflects the concern that lengthy approval processes could interfere with technical consulting, engineering analysis, and other activities that depend on access to relevant information.
3. Use controlled distribution and access records
The comments consider the use of secure, password-protected online access as one possible method of distributing information. They also recommend maintaining records of the information accessed by individual users so that access patterns can be reviewed when necessary.
The broader objective is to combine access controls with oversight while preserving the ability of authorized organizations to carry out legitimate work.
4. Address information derived from sensitive data
PSEC emphasizes that information-security policies should not consider only the original datasets. Technical analyses and other products derived from those datasets may also contain information that requires protection.
The filing proposes that users and technical consultants work with the relevant infrastructure coordinator to ensure that recipients of derived products have appropriate authorization before receiving them.
This issue is particularly relevant to engineering and consulting work, where technical conclusions may be accompanied by supporting data or processed information.
Public Information and Infrastructure Disclosure
The filing also considers the distinction between information that is already widely available and technical details that may warrant controlled access.
PSEC acknowledges that major power plants and transmission lines are generally known through public information and established permitting processes. The comments argue that withholding broadly available location information would not necessarily provide meaningful protection.
At the same time, the organization maintains that some technical details may warrant greater care in how they are disclosed. It recommends considering how information is presented and whether unnecessary location details can be excluded from materials distributed through controlled-access processes.
The broader point is that infrastructure information should be evaluated according to its actual sensitivity and legitimate uses, rather than being treated as a single, uniform category.
Implications for the Competitive Electricity Market
PSEC’s comments emphasize that the electricity industry depends on technical information to support planning, operations, equipment development, research, and consulting services.
The filing argues that information-security procedures should reduce the risk of inappropriate disclosure without creating excessive administrative barriers for legitimate users. The organization acknowledges that implementing access controls and oversight processes will involve costs, but maintains that protection measures can be designed to preserve the essential functions of a competitive electricity market.
In its conclusion, PSEC states that “some level of protection is required” and argues that these safeguards should be implemented without severely affecting the work necessary to support competitive electricity markets.
These statements represent GE Power Systems Energy Consulting’s position in its 2002 comments, rather than a summary of FERC’s final regulatory decisions.
Historical Significance
This filing provides a historical perspective on the policy debate surrounding the handling of sensitive electric infrastructure information in the early 2000s.
It documents an industry participant’s recommendations on access eligibility, processing times, oversight, derived technical products, and the distinction between national security concerns and commercial confidentiality.
For researchers examining energy regulation, electric grid planning, critical infrastructure policy, and the evolution of information-access procedures, the document offers insight into the considerations raised by a technical consulting organization during FERC’s rulemaking process.
The filing records PSEC’s recommendations and concerns; it does not, by itself, establish which proposals FERC ultimately adopted.
For complete details, download the full document: Download
Pages: 7