ROVER PIPELINE PROJECT
Resource Report 6 Geological Resources
DRAFT APPENDIX 6A
Supplemental Tables
TABLE 6A-1 Surficial Materials Crossed by the Pipeline Facilities ........................................................... 1
TABLE 6A-2 Surficial Materials at the Aboveground Facilities ................................................................. 7
TABLE 6A-3 Bedrock Geology Crossed by the Pipelines ........................................................................... 8
TABLE 6A-4 Bedrock at the Aboveground Facilities ................................................................................ 23
TABLE 6A-5 Surface Mines within 0.25 mile of the Pipelines ................................................................. 24
TABLE 6A-6 Oil and Gas wells within 0.25 mile of the Pipelines ............................................................ 27
TABLE 6A-7 Historic Earthquakes in the Project Area ............................................................................. 53
TABLE 6A-8 Landslide Hazard Areas ....................................................................................................... 55
January 2015
ROVER PIPELINE PROJECT
Resource Report 6 Geological Resources
TABLE 6A-1
Surficial Materials Crossed by the Pipeline Facilities
Pipeline Segment State Begin MP End MP Surficial Geology
Supply Laterals:
Sherwood Lateral WV 0.00 35.72 No Data Available
OH 35.72 54.0 Colluvium
CGT Lateral WV 0.00 5.68 No Data Available
Seneca Lateral: OH 0.00 25.63 Colluvium
Berne Lateral: OH 0.00 3.69 Colluvium
Clarington Lateral: OH 0.00 32.65 Colluvium
Majorsville Lateral: WV 0.00 12.6 No Data Available
OH 12.6 23.86 Colluvium
Cadiz Lateral: OH 0.00 2.94 Colluvium
Burgettstown Lateral: PA 0.00 10.4 Colluvium
WV 10.65 15.7 No Data Available
OH 15.7 14.72 Colluvium
OH 14.72 49.59 Colluvium
OH 49.59 51.3 Lake Deposits
Supply Connector
OH 0.00 18.77 Colluvium
Lines A and B
Mainlines:
Mainlines A and B OH 18.76 20.76 Colluvium
OH 20.76 21.69 Lake Deposits
OH 21.69 23.42 Colluvium
OH 23.42 25.10 Lake Deposits
OH 25.10 25.66 Colluvium
OH 25.66 29.84 Lake Deposits
OH 29.84 32.75 Colluvium
OH 32.75 39.45 Outwash
OH 39.45 41.85 Colluvium
OH 41.85 44.97 Outwash
OH 44.97 46.75 Ground Moraine
OH 46.75 47.12 Ridge Moraine
OH 47.12 49.66 Kames and Eskers
OH 49.66 50.52 Ground Moraine
OH 50.52 52.90 Ridge Moraine
OH 52.90 54.48 Ground Moraine
OH 54.48 55.58 Ridge Moraine
OH 55.58 56.28 Ground Moraine
OH 56.28 63.07 Ridge Moraine
1 January 2015
ROVER PIPELINE PROJECT
Resource Report 6 Geological Resources
TABLE 6A-1
Surficial Materials Crossed by the Pipeline Facilities
Pipeline Segment State Begin MP End MP Surficial Geology
Mainlines A and B OH 63.07 63.59 Ground Moraine
OH 63.59 64.96 Ridge Moraine
OH 64.96 65.70 Ground Moraine
OH 65.70 67.13 Ridge Moraine
OH 67.13 68.55 Ground Moraine
OH 68.55 68.89 Ground Moraine
OH 68.89 69.06 Ground Moraine
OH 69.06 70.48 Ridge Moraine
OH 74.33 74.53 Ground Moraine
OH 74.53 75.33 Ridge Moraine