Motion to Intervene of Consolidated Edison Company of New York, Inc. and Philadelphia Gas Works under CP13-501.
07/10/2013Submittal in Support of Applications under Section 3 and Section 7 of the Natural Gas Act December 2015 Docket No. PF14-17-000 Resource Report 1: General Project Description DOCKET NO. PF14-17-000 RESOURCE REPORT 1: GENERAL PROJECT DESCRIPTION Summary of Filing Information Minimum Requirements Resource Information Report Location 1. Provide a detailed description and location map of the project facilities. Section 1.3.1 ( 380.12(c)(1)) Figures 1-1, 1-2 Include all pipeline and aboveground facilities. and 1-3 Include support areas for construction or operation. Identify facilities to be abandoned. 2. Describe any non-jurisdictional facilities that would be built in Section 1.10 association with the project. ( 380.12(c)(2)) Include auxiliary facilities (See 2.55(a)). Describe the relationship to the jurisdictional facilities. Include ownership, land requirements, gas consumption, megawatt size, construction status, and an update of the latest status of Federal, state, and local permits/approvals. Include the length and diameter of any interconnecting pipeline. Apply the four-factor test to each facility (see 380.12(c)(2)(ii)). 3. Provide current original U.S. Geological Survey 7.5-minute-series Figures 1-1; 1- topographic maps with mileposts showing the project facilities. 5; and 1-7 ( 380.12(c)(3)) Maps of equivalent detail are acceptable if legible (check with staff). Show locations of all linear project elements, and label them. Show locations of all significant aboveground facilities, and label them. 4. Provide aerial images or photographs or alignment sheets based on Figures 1-2; 1- these sources with mileposts showing the project facilities. 4; and 1-6 ( 380.12(c)(3)) No more than 1-year old. Scale no smaller than 1:6,000. 5. Provide plot/site plans of compressor stations showing the location of No compressor the nearest noise sensitive areas (NSA) within 1 mile. ( 380.12(c)(3,4)) stations Scale no smaller than 1:3,600. Show reference to topographic maps and aerial alignments provided above. 6. Describe construction and restoration methods. ( 380.12(c)(6)) Section 1.5 Include this information by milepost. Make sure this is provided for offshore construction as well. For the offshore this information is needed on a mile-by-mile basis and will require completion of geophysical and other surveys before filing. 7. Identify the permits required for construction across surface waters. Section 1.8, ( 380.12(c)(9)) Table 1-5 Include the status of all permits. For construction in the Federal offshore area be sure to include i LLNG RR1 DOCKET NO. PF14-17-000 RESOURCE REPORT 1: GENERAL PROJECT DESCRIPTION Summary of Filing Information Minimum Requirements Resource Information Report Location consultation with the MMS. File with the MMS for rights-of-way grants at the same time or before you file with the FERC. 8. Provide the names and address of all ...