Submission of Central New York Oil And Gas Company LLC under CP10-480.
11/17/2011VOLUME II PUBLIC VENTURE GLOBAL CALCASIEU PASS, LLC TRANSCAMERON PIPELINE, LLC CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINEPROJECT RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION Federal Energy Regulatory Commission Environmental Checklist Minimum Filing Requirements: Report Section Reference Provide a detailed description and location map of the Project facilities. (380.12(c)(1)) Section 1.3 and figures 1.1- 1,1.1-2, 1.3-1, and 1.3-2 Describe any nonjurisdictional facilities that would be built in association with the Project. Section 1.8 (380.12(c)(2)) Provide current original U.S. Geological Survey 7.5-minute series topographic maps with Figures 1.3-2, 1.3-5 , 1.3-5D, mileposts showing the Project facilities. (380.12(c)(3)) 1.3-6 and 1.3-6D Provide aerial images or photographs or alignment sheets based on these sources with Figures 1.3-1, 1.3-3 and 1.3- mileposts showing the Project facilities. (380.12(c)(3)) 3D, 1.3-4 and 1.3-4D, and 1.3- 18 and 1.3.19 Provide plot/site plans of compressor stations showing the location of the nearest noise- Not applicable sensitive areas (NSA) within 1 mile. (380.12(c)(3,4)) Describe construction and restoration methods. (380.12(c) (6)) Section 1.5.2 Identify the permits required for construction across surface waters. (380.12(c)(9)) Section 1.9 Provide the names and addresses of all affected landowners and certify that all affected Section 1.10 and appendix 1B landowners will be notified as required in 157.6(d). (380.12(a)(4) and (c)(10)) (filed as Privileged Information Do Not Release) Describe all authorizations required to complete the proposed action and the status of Section 1.9 applications for such authorizations. Provide plot/site plans of all other aboveground facilities that are not completely within the Appendix 1A right-of-way. Provide detailed typical construction right-of-way cross-section diagrams showing Figures 1.3-15a-c information such as widths and relative locations of existing rights-of-way, new permanent right-of-way, and temporary construction right-of-way. See Resource Report 8. Summarize the total acreage of land affected by construction and operation of the project. Section 1.4.3 and table 1.4.3-1 If Resource Report 5, Socioeconomics is not provided, provide the start and end dates of Section 1.5.1 and Resource construction, the number of pipeline spreads that would be used, and the workforce per Report 5. spread. 1-i September 2015 Calcasieu Pass Terminal and TransCameron Pipeline Project Resource Report 1 General Project Description VENTURE GLOBAL CALCASIEU PASS, LLC TRANSCAMERON PIPELINE, LLC CALCASIEU PASS TERMINAL AND TRANSCAMERON PIPELINE PROJECT RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION TABLE OF CONTENTS 1.0 RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION ...............................1-1 1.1 INTRODUCTION ..............................................................................................1-1 1.2 PURPOSE AND NEED .................................................................