Motion to intervene of UGI Utilities, Inc re Transcontinental Gas Pipe Line Corp under RP04-570.

Joel deJesus

Counsel

September 21, 2004

VIA ELECTRONIC FILING

The Honorable Magalie Roman Salas, Esq,

Secretary

Federal Energy Regulatory Commission

888 First Street, NE

Washington, DC 20426

Re: Docket Nos. TS04-46-000; RM01-10-003

Dear Secretary Salas:

Please find enclosed for electronic filing in Docket Nos. TS04-46-000 and RM01-10-003,

the Request of National Grid USA for Extension of Time.

Please do not hesitate to contact me if you have any questions or concerns.

Respectfully submitted,

Joel deJesus

Counsel for

National Grid USA

633 Pennsylvania Ave. NW, Sixth Floor

Washington, DC 20004

(202) 783-7959 Fax: (202) 783-1489

joel.dejesus@us.ngrid.com

BEFORE THE

FEDERAL ENERGY REGULATORY COMMISSION

National Grid USA ) Docket No. TS04-46-000

Standards of Conduct for ) Docket No. RM01-10-003

Transmission Providers )

REQUEST OF NATIONAL GRID USA

FOR EXTENSION OF TIME

Pursuant to Rule 212 of the Commissions Rules of Practice and Procedure, 18 C.F.R.

385.212, National Grid USA (National Grid) hereby respectfully requests an extension of

time for compliance with the Commissions standards of conduct.

As provided in 18 C.F.R. 358.4(c) (e) (2), transmission providers are generally required

to be in full compliance with the Commissions standards of conduct for transmission providers

by September 22, 2004 (Compliance Deadline). While National Grid has undertaken to

comply substantially with the Commissions standards of conduct by the Compliance Deadline,

significant issues concerning the nature of National Grids compliance obligations remain

unresolved. In particular, in the above referenced dockets, National Grid has pending waiver and

rehearing requests concerning the issue of whether National Grids electric local distribution

company (LDC) subsidiaries, Granite State Electric Company and Nantucket Electric

Company, must be treated as Energy Affiliates under 18 C.F.R. 358.3(d). If the Commission

does not act on those pleadings before the Compliance Deadline, National Grid respectfully

requests an extension of time to comply with the Commissions standards of conduct. In

addition, if the Commission were to issue one or more orders denying either or both of National

Grids pending requests, National Grid respectfully requests an extension of 90 days from the

date of such rulings to incorporate any directions by the Commission in such order(s).

DISCUSSION

This request for extension of time arises out of questions concerning the possible Energy

Affiliate status of National Grids two small, electric LDC subsidiaries, Granite State Electric

Company and Nantucket Electric Company.1 On February 9, 2004, National Grid filed for a

limited waiver of the Commissions regulations with respect to the ...