Application Cove Point Liquefaction Project of Dominion Cove Point LNG, LP under CP13-113.
03/31/2013Dominion Cove Point LNG, LP Cove Point Liquefaction Project Docket No. CP13- -000 Resource Report 5 Socioeconomics APRIL 2013 VOLUME I OF III PUBLIC Resource Report 5 Socioeconomics Summary of Required FERC Report Information Report Reference or Topic FERC Reference Not Applicable 1. For major aboveground facilities and major pipeline 380.12(g)(1) Section 5.1 projects that require an EIS, describe existing socioeconomic conditions within the project area 2. For major aboveground facilities, quantify impact on 380.12(g)(2-6) Section 5.2 employment, housing, local government services, local tax revenues, transportation, and other relevant factors within the project area. Report Reference or Additional Information Not Applicable Evaluate the impact of any substantial immigration of people on governmental facilities NA and services and describe plans to reduce the impact on local infrastructure. Describe onsite manpower requirements, including the number of construction Section 5.2.1 personnel who currently reside within the impact area, would commute daily to the site from outside the impact area, or would relocate temporarily within the impact area. Estimate total worker payroll and material purchases during construction and operation. Section 5.2.3 Determine whether existing housing within the impact area is sufficient to meet the Section 5.2.5 needs of the additional population. Describe the number and types of residences and businesses that would be displaced by Section 5.2.6 the project, procedures to be used to acquire these properties, and types and amounts of relocation assistance payments. Conduct a fiscal impact analysis evaluating incremental local government expenditures Section 5.2.4 in relation to incremental local government revenues that would result from construction of the project. Incremental expenditures include, but are not limited to, school operating costs, road maintenance and repair, public safety, and public utility costs. 5-i Resource Report 5 Socioeconomics TABLE OF CONTENTS Summary of Required FERC Report Information .................................................................. 5-i Appendix List........................................................................................................................5-iii List of Tables ........................................................................................................................5-iii List of Figures ........................................................................................................................ 5-v Acronym List ........................................................................................................................ 5-vi 5.0 Socioeconomics ............................................................................................................... 5-1 5.1 Socioeconomic Impact Area ................................................................................ 5-3 5.1.1 Population ..........................................