Transcontinental Gas Pipe Line Company, LLC

Resource Report No. 1

General Project Description

Supplemental Project Information No. 2

Dalton Expansion Project

Docket No. CP15-117-000

September 2015

DALTON EXPANSION PROJECT RESOURCE REPORT 1 - GENERAL PROJECT DESCRIPTION

RESOURCE REPORT 1 - GENERAL PROJECT DESCRIPTION

Summary of Filing Information

Minimum Requirements Found in Section

1. Provide a detailed description and location Figure of the project facilities.

( 380.12[c][1]) Section 1.2.2

Include all pipeline and aboveground facilities. Section 1.2.3

Include support areas for construction or operation. Figure 1-1

Identify facilities to be abandoned.

2. Describe any non-jurisdictional facilities that will be built in association with the project.

( 380.12[c][2])

Include auxiliary facilities (See 2.55[a]).

Describe the relationship to the jurisdictional facilities.

Section 1.8

Include ownership, land requirements, gas consumption, megawatt size, construction

status, and an update of the latest status of federal, state, and local permits/ approvals.

Include the length and diameter of any interconnecting pipeline.

Apply the four-factor test to each facility (see 380.12[c] [2] (ii)).

Figure 1-4

3. Provide current original U.S. Geological Survey (USGS) 7.5-minute-series topographic Figure 1-7

Figures with mileposts showing the project facilities. ( 380.12[c][3]) Figure 1-10

Show locations of all linear project elements, and label them. Figure 1-13

Show locations of all significant aboveground facilities, and label them. Figure 1-16

Figure 1-19

4. Provide aerial images or photographs or alignment sheets based on these sources with

mileposts showing the project facilities. ( 380.12[c][3])

Appendix II.A

No more than 1-year old. (Volume II)

Scale no smaller than 1:6,000.

5. Provide plot/site plans of compressor stations showing the location of the nearest

noise-sensitive areas (NSA) within 1 mile. ( 380.12[c][3,4]) Resource Report 9

Air and Noise

Scale no smaller than 1:3,600.

Quality

Show reference to topographic Figures and aerial alignments provided above.

6. Describe construction and restoration methods. ( 380.12[c][6])

Section 1.3

Include this information by milepost.

7. Identify the permits required for construction across surface waters. ( 380.12[c][9])

Table 1-10

Include the status of all permits.

8. Provide the names and address of all affected landowners and certify that all affected Appendix III.A

landowners will be notified as required in 157.6(d). ( 380.12[c][10]) (Volume III)

Provide an electronic copy directly to the environmental staff. Section 1.7

ii

DALTON EXPANSION PROJECT RESOURCE REPORT 1 - GENERAL PROJECT DESCRIPTION

Additional Information Found in Section

Describe all authorizations required to complete the proposed action and the status of

Table 1-10

applications for such authorizations.

Appendix II.B

Plot site plans of all other aboveground facilities which are not completely within the right-of- (Volume II)