Abbreviated Application for Authorization to Abandon Certain Mainline Facilities and a Certificate of Public Convenience and Necessity (Abandonment and Capacity Restoration Project) of Tennessee Gas Pipeline Company, L.L.C. under CP15-88.
02/12/2015Resource Report 1 General Project Description Tennessee Gas Pipeline Company, L.L.C. Abandonment and Capacity Restoration Project February 2015 TENNESSEE GAS PIPELINE COMPANY, L.L.C. ABANDONMENT AND CAPACITY RESTORATION PROJECT RESOURCE REPORT 1 GENERAL PROJECT INFORMATION Summary of Filing Information Filing Requirement Location within this Document Minimum Requirements to Avoid Rejection 18 CFR 380.12 (c)(1) Provide a detailed description and location map of Sections 1.1.2 and 1.1.3; the project facilities. Appendices1A through 1G Include all pipeline and aboveground facilities. Include support areas for construction or operation. Identify facilities to be abandoned. 18 CFR 380.12 (c)(2) Describe any non-jurisdictional facilities that would Section 1.8; Appendix 1M be built in association with the project. Include auxiliary facilities (See 2.55(a)). Describe the relationship to the jurisdictional facilities. Include ownership, land requirements, gas consumption, megawatt size, construction status, and an update of the latest status of Federal, state, and local permits/approvals. Include the length and diameter of any interconnecting pipeline. Apply the four-factor test to each facility (see 380.12(c)(2)(ii)). 18 CFR 380.12 (c)(3) Provide current original US Geological Survey 7.5- Appendices 1D, 1G minute-series topographic maps with mileposts showing the project facilities. Maps of equivalent detail are acceptable if legible (check with staff). Show locations of all linear project elements, and label them. Show locations of all significant aboveground facilities, and label them. 18 CFR 380.12 (c)(3) Provide aerial images or photographs or alignment Appendices 1F, 1G sheets based on these sources with mileposts showing the project facilities. No more than 1-year old. Scale no smaller than 1:6,000. 18 CFR 380.12 (c)(3,4) Provide plot/site plans of compressor stations Figures 1-3 through 1-8; showing the location of the nearest noise sensitive areas. Appendix 1L (Volume III) Scale no smaller than 1:3,600. Show reference to topographic maps and aerial alignments provided above. 18 CFR 380.12 (c)(6) Describe construction and restoration methods. Section 1.3; Appendices 1H Include this information by milepost. through 1K- Make sure this is provided for offshore construction as well. For the offshore this information is needed on a mile-by-mile basis and will require completion of geophysical and other surveys before filing. February 2015 i RESOURCE REPORT 1 GENERAL PROJECT INFORMATION Summary of Filing Information Filing Requirement Location within this Document Minimum Requirements to Avoid Rejection 18 CFR 380.12 (c)(-9) Identify the permits required for construction Section 1.6 and Table 1-6 across surface waters. Include the status of all permits. For construction in the Federal offshore area be sure to include consultation with the MMS File with the MMS for rights-of-way grants at ...