Save Passamaquoddy Bay states Calais LNG has no standing in FERC permitting, and supplies EIA data contradicting Calais LNG's statement that constructing natural gas pipelines to increase supply in New England is impossible, under CP10-31-000, et. al.

U.S.naturalgaspipelineprojects

Clickworksheetnameortabatbottomfordata

WorksheetName

NaturalGasPipelineProjects

Definitions

Regions

ReleaseDate:

NextReleaseDate:

ExcelFileName:

AvailablefromWebPage:

Sources:

ForHelp,Contact:

Note:

WorkbookContents

elineprojects

tabatbottomfordata

Description

Naturalgaspipelineprojectsfrom1997topresent

Dataclassificationdefinitions

Regiondefinitions

2/30/2012

4/1/2012

EIANaturalGasPipelineProjects.xlsx

http://www.eia.gov/naturalgas/data.cfm

Public press releases and state and federal agencys' websites (e.g. Federal Energy Regulatory Commission)

tu.tran@eia.gov

(202)2876589

This file contains an aggregation of natural gas pipeline and expansion projects slated to commence

coming years. The data are not collected on an EIA survey. This information was compiled from trad

FERC, Bentek, and other industry sources on planned pipeline construction. The amount of capacity

that come online may be significantly different than reflected in accompanying data. These data are

forecast. For further information, see the Definitions tab. Generally, only transmission lines are inc

file; gathering lines, distribution lines, and LNG marine terminals are excluded. For questions, please

Tran.

Units Frequency

Millioncubicfeetperday(MMcf/d) Quarterly

1/27/201210:56:38AM

s (e.g. Federal Energy Regulatory Commission)

and expansion projects slated to commence operations in

vey. This information was compiled from trade press, SNL,

peline construction. The amount of capacity additions

flected in accompanying data. These data are not a

tab. Generally, only transmission lines are included in this

terminals are excluded. For questions, please contact Tu

Last Updated Date Project Name

7/21/2010 Perryville Storage Laterals

Fort Necessity Storage

7/21/2010 Lateral

7/29/2010 Skipanon LNG Pipeline

1/14/2011 Iroquois NY Marc Project

11/3/2011 Atlantic Access Project

2/14/2011 Downeast LNG Lateral

Transco Rockaway

11/1/2011 Delivery Project

Ohio Pipeline Energy

12/21/2011 Network

2/14/2011 Overbeck to Leidy Project

7/21/2010 MoBay Storage Line

5/17/2010 Oregon Pipeline

2/14/2011 Northeast Passage Project

AES Mid-Atlantic Express

2/14/2011 Project

3/19/2010 Port Dolphin LNG Pipeline

Pacific Connector Gas

2/11/2011 Pipeline

NWPL Blue Bridge Pipeline

5/26/2010 Project

Clearwater LNG Facility

6/26/2009 Pipeline

Piedmont/Progress

2/17/2011 Pipeline

2/14/2011 Northeast Upgrade Project

7/23/2010 Calais LNG Lateral

7/29/2010 Point Comfort LNG Line

6/26/2009 Baja Path Expansion

Mississippi Hub Storage

7/21/2010 Phase 2

7/30/2010 NJ-NY Project

Willcox Lateral 2013

5/5/2011 Expansion Project

12/16/2011 MMP Project

MPP Pipeline Project/300

Line Expansion Project

10/7/2011 expansion

New Jersey to New York

2/14/2011 Expansion Project

6/22/2011 Tioga Lateral Project

Northeast Supply Link

12/14/2011 Project

Dominion Keystone

1/22/2010 Pipeline

Mid-Atlantic Connector

7/30/2010 Expansion

Northeast Supply

9/15/2011 Diversification Project

7/21/20

For complete details, download the full document: Download

Back to blog