Pipeline maps related documents

  • 106893f4ff236a4a

    2014 Annual Report of Replacement of Facilities Under Section 2.55(b) of Rockies Express Pipeline LLC under CP15-99.

    2015:02:25

    February 26, 2015Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426Attention: Ms. Kimberly D. Bose, SecretaryRe: Rockies Express Pipeline LLC; 2014 Annual Report of Replacement of Facilities Under Section 2.55(b), Docket No. CP15-Ladies and Gentlemen:As required by Section 2.55(b)(4) of the Federal Energy Regulatory Commission's (Commission) Statements of General Policy and Interpretations Under the Natural Gas Act, Rockies Express Pipeline LLC (Rockies Express) hereby submits its report describing the replacement projects completed for the period January 1, 2014 through December 31, 2014, which were exempt from the advance notification requirements as specified by Section 2.55(b)(2).Rockies Express report is comprised of: (i) this letter of transmittal; (ii) a brief description and cost of construction of the facilities replaced; (iii) procedures utilized for erosion control, revegetation and maintenance, and stream and wetland crossings; and (iv) U.S. Geological Survey 7.5-minute series topographic maps showing the location of the facilities replaced. Rockies Express is filing this document pursuant to the Commissions eFiling procedures.Respectfully submitted,Rockies Express Pipeline LLCBy /s/ David Haag David Haag Vice President, Regulatory370 Van Gordon Street Lakewood, CO 80228-1519 303.763.2950